What Is Penetration Test of Bitumen?

The penetration test of bitumen measures the hardness or softness of bitumen by measuring the depth of penetration of a standard loaded needle in five seconds while maintaining the bitumen sample temperature at 25 °C. The more viscous the bitumen, the less distance needle is able to penetrate. Hence, the penetration value for viscous bitumen is less.

Also, the softening point of viscous bitumen is more. Thus, a bitumen sample with a low penetration value has a high softening point. The road pavement comprises stone chippings attached together with the help of a binder like bitumen.

Bitumen is available in the market in various grades. The suitable grade of bitumen is selected as per the surfacing type and climatic conditions as well.

The grading of the bitumen is done on the basis of the consistency of bitumen. The consistency, in turn, is measured by the penetration value obtained from the penetration test of the bitumen.

Aim

To determine the penetration value of asphaltic bitumen, fluxed native asphalt, and blown type bitumen.

In this practical, the consistency of the sample is determined by measuring the distance in one-tenth of a millimeter the distance by which the penetrating needle penetrates the sample under certain loading (100 g) at 25 °C  for 5 seconds.

Read More: Viscosity Test of Bitumen- Absolute, Kinematic, Industrial Viscosity

Penetration: It is the distance traveled by a standard needle of 1 sq. mm cross-section and comprising specific size, weight, and shape under predetermined conditions of temperature as well as time in terms of one-tenth of a millimeter.

Bitumen Penetration Test IS Code is IS:1203-1978 – Method of testing bitumen and tar.

Apparatus

Following apparatus required for a penetration test

Penetrometer: It is the testing machine for bitumen penetration tests. It allows fixation of penetration needle, plunger, weight, and a dial. It allows the needle to penetrate into the sample placed in the cup without considerable friction. It should be accurately calibrated so that it gives the results in one-tenth of a millimeter.

 penetration test of bitumen Apparatus
Apparatus

There are two types of penetrometer

1. Standard Penetrometer: The knob is to be pressed for five seconds manually so that the released needle can penetrate the sample.

2. Automatic penetrometer: The penetration needle is automatically released for five seconds with the help of a timer and then stops.

3. Standard Penetration needle: It is straight, highly polished, and cylindrical made up of stainless steel. It has a 3 mm diameter shank into which it is fixed such that its movement is restricted. The taper is pointed while the point is made blunt by grinding to a truncated cone.

Total length of the needle =  50 mm

Diameter of needle = 1.0 mm

Diameter of the pointed end of the needle = 0.14-0.16 mm

Weight = 50 gram

4. Container: The material is either metal or glass and it is cylindrical in shape. Its bottom is flattened. The dimensions of the container are mentioned below:

Container
Container

For penetration value < 225

Diameter = 55 mm

Internal Height = 35 mm

For penetration value > 225

Diameter = 70 mm

Internal Height = 45 mm

5. Water bath: It should contain a minimum of 10 liters of water. Bitumen specimen should be immersed to at least 100 mm depth from the top. Moreover, the specimen should be supported over a perforated shelf which should be above 50 mm from the bottom of the bath. The water bath is maintained at 25 ± 0.1 °C temperature.

Water Bath for Bitumen Test
Water Bath for Bitumen Test

6. Transfer Dish: It is a small dish or tray It helps in keeping the container fully immersed in the water when placed in the water bath. It has some means to ensure a firm bearing so that the container does not shake.

7. Thermometer or Temperature indicator– To measure the temperature of water in the water bath. Its range should be from 0 to 44 °C. Its least count is 0.2 °C.

8. Time device: If a standard penetrometer is used, a suitable time device like a stopwatch, electric timer, or another spring-actuated device may be used which is graduated 0.1 second or less. The timing device should have an accuracy of ± 0.1 seconds for a 60-second interval. Even an audible seconds counter where one beat corresponds to one second can also be used alternatively.

Other accessory apparatus include:

Materials

Following materials required test,

  • Bitumen of known grade
  • Benzene  

Precaution

Following precautions should be taken while performing the penetration test on bitumen,

  • For a sample having extraneous matter, the sample should be sieved through IS sieve 30
  • Ensure no air bubbles or water remain entrapped after heating the sample
  • An air oven can be used to avoid overheating the bottom of the container. Or a sand bath can also be used.
  • The needle is so adjusted that it just touches the bitumen sample- it should not penetrate the bitumen surface beforehand
  • If there is any movement of the container while the needle is penetrating, the test should be discarded.

Penetration Test of Bitumen Procedure 

Sample Preparation

  1. Take the bitumen sample in a beaker and heat it to a temperature above its approximate softening point. For tars and pitches, it is heated up to 60 °C while bitumen is heated up to 90 °C.
  2. Allow the bitumen to melt until it achieves a pouring consistency. Keep stirring the sample so that the sample is homogenous and free from air bubbles and water.
  3. Pour the melted bitumen into the container at 35 mm depth until it is filled up to a depth of 10 mm more than the expected penetration.
  4. Place the container on the transfer dish and allow it to cool in the atmosphere at a temperature in-between 15-30 °C for 1.0-1.5 hours when a 35 mm deep container is used. The time period is increased to 1.5-2.0 hours when a 45 mm deep container is used.
  5. Place the whole assembly with the container and transfer the dish to a water bath, which is maintained at 25 ± 0.1 °C for about 1.5-2.0 hours when a 35 mm deep container is used. The time period is reduced to 1.0-1.5 hours when a 45 mm deep container is used.
  6. When cutback bitumen or Digboi type bitumen is to be tested, the residue left after the distillation process is used for this test.

Testing of the Specimen

1. Remove the transfer dish from the water bath and fill the water from the water bath in the dish to such a depth that the container is covered completely.

2. Place the sample container in this transfer dish and place this assembly under the penetration needle on the penetrometer.

3. Clean the needle with cotton dabbed in benzene and allow it to dry. Load the needle to the specified weight.

4. Adjust the needle so that its tip just touches the surface of the bitumen sample. Finely adjust the needle by raising the platform slightly with the help of adjusting the screw. Check the contact of the needle to the surface of bitumen by observing the image of the needle reflected by the surface of the material.

5. Clamp the needle in this position.

6. Load the needle holder with a weight such that the total moving weight is equal to 100 ± 0.25 grams.

Moving weight = weight of needle + weight of carrier + superimposed weights

7. Note down the initial reading of the dial of the penetrometer. Or bring the pointer to zero.

8. In a standard penetrometer, release the needle for exactly 5 seconds by pressing the knob. Measure the time with the help of a stopwatch.

9. In an automatic penetrometer, release the needle for exactly 5 seconds by pressing the start button.

10. Rotate the knob on the dial and note down the final reading from the dial as the penetration value is one-tenth of a millimeter.

11. Clean the needle with benzene after every test and allow it to dry.

12. Take at least 3 penetration values on the surface of the sample. (For a sample with penetration value > 225 mm, leave the needle in the sample and use another needle to take another reading so that the sample is not disturbed.)

Distance between two test points ≮ 10 mm

Distance between the test point and the side of the dish ≮ 10 mm

13. Take out the average of the three values and note it as the penetration value of the sample.

14. If the penetration ratio is to be determined: Carry out the entire test procedure at 4 °C. Tolerance of 0.1 °C can be allowed.

In this test,

Take the total weight on the penetration needle = 200 ± 0.25 grams.

Increase the time of penetration to 60 seconds.

Observation

In the penetration test, as the needle of the penetrometer is released, it penetrates the sample to some distance.

The distance by which the needle penetrates the bitumen sample is to be noted down for all three samples.

Observation Table

A sample observation table is drawn below for the bitumen penetration test,

Actual test temperature (in °C) =
Penetrometer Dial ReadingTest 1Test 2Test 3
Initial Reading (a)   
Final Reading (b)   
Penetration Value (b-a)   

Penetration Value of Bitumen = Average Value of Penetration of Sample – 1, 2 & 3

Penetration Ratio:

Penetration at 4 °C – Wt. 200 gm – time 60s / Penetration at 25 °C – Wt. 100 gm – time 5s) x 100

Result

In the penetration test of bitumen, the average of the penetration values obtained from the three tests is the penetration value of the given bitumen specimen.

The penetration values of the three readings should not differ from each other beyond certain limits. These limits are mentioned in the table below:

Penetration ValueThe maximum difference between readings
0 – 492
50 – 1494
149 – 2496
≥ 2508

Minimum penetration values standardized by the Bureau of Indian Standard for Paving Bitumen Type1 for different grades are tabulated below:

Grade of Bitumen Type-IDuctility (in cm)
S – 3530 – 40
S – 4540 – 50
S – 5550 – 60
S – 6560 – 70
S – 9080 – 100
S – 200175 – 225

Conclusion of Penetration Test of Bitumen

By performing the above penetration test on bitumen, we can determine whether the given bitumen sample meets the specification requirements for penetration as given in the standards.

Penetration value is one of the measures of the quality of bitumen along with other measures such as ductility value and so on.

The penetration value found by the penetration test of bitumen is compared to the standard value and thus it can be concluded whether the sample meets the penetration criteria.

Summary

Following table show step by step procedure of the bitumen penetration test with a picture

Procedure

Penetration Test of BitumenThe bitumen sample is heated in a beaker up to 60-90 °C- above the softening point of bitumen till it achieves a pouring consistency.
Penetration Test of BitumenThe sample is stirred thoroughly so that a homogenous mix is obtained which is free from air bubbles and water.
Penetration Test of Bitumen

Melted bitumen is poured into the 53 mm deep container till it is filled 10 mm excess to an approximate penetration depth.

Penetration Test of BitumenThe container along with the sample is placed in the transfer tray and is allowed to cool in the atmosphere between the temperature range- 15-30 °C for 1-1.5 hours (for a 35 mm deep container).
Penetration Test of BitumenThe whole assembly is placed in the water bath at 25 ± 0.1 °C for 1.5-2 hours (for a 35 mm deep container).
Penetration Test of BitumenThe transfer dish is removed from the water bath and filled with water from the water bath till it covers the container completely.
Penetration Test of Bitumen

The sample container along with the transfer dish is placed on the platform of the penetrometer under the needle.

The needle is cleaned with cotton dabbed in benzene.

Penetration Test of BitumenLower the needle assembly so that the tip of the needle just touches the surface of the bitumen.
Penetration Test of BitumenAdjust the needle finely with the help of adjusting the screw.
Penetration Test of Bitumen

Penetration Test of Bitumen

The contact of the tip of the needle to the bitumen surface is checked by observing the image of the needle reflected on the surface.

Or it can also be checked by a mirror.
Penetration Test of BitumenThe needle assembly is clamped in this adjusted position carefully.
Penetration Test of Bitumen

The needle holder is loaded with a weight such that

Total moving weight =  100 ± 0.25 grams.
Penetration Test of Bitumen

The pointer of the dial is set to zero.

Or the initial reading is noted down.
Penetration Test of Bitumen

Standard Penetrometer

The needle is released for exactly 5 seconds by pressing the knob.

The time is measured from a stopwatch with specifications as discussed in the apparatus.
Penetration Test of Bitumen

Automatic Penetrometer

The needle is released for exactly 5 seconds by pressing the start button.
Penetration Test of BitumenThe knob on the dial is rotated to take the reading for the test.
Penetration Test of BitumenThe difference between the final and initial reading is noted as a penetration value is one-tenth of a millimeter.
Penetration Test of BitumenThe needle is cleaned with benzene and allowed to dry after each test.
Penetration Test of Bitumen

At least, three penetration values are taken for a sample.

Distance between these points ≮ 10 mm.

Distance between the testing point and the edge of the container ≮ 10 mm.
Penetration Test of BitumenThe average of the three values is noted down as the penetration value of the sample.

To Determine Penetration Ratio:

The above procedure is followed and the test is carried out at 4 ± 0.1 °C

Total weight on the penetration needle = 200 ± 0.25 g

Penetration time = 60 sec
Penetration value of the sampleThe average penetration value is taken at 3 distinct points. (The values should not differ by ± 2-8 %  of the mean value depending on the penetration value obtained).
Penetration RatioPenetration at 4 °C – Wt. 200 gm – time 60s / Penetration at 25 °C – Wt. 100 gm – time 5s) x 100

You May Also Like: