Building Construction Process Step by Step

Building construction is the process of creating a structure, such as a building, bridge, or other infrastructure, from a set of design plans and specifications.

The building construction process involves assembling a variety of materials and components, such as concrete, steel, wood, and glass, and coordinating a variety of skilled trades and professionals, such as architects, engineers, contractors, and construction workers, to bring the design to life.

This is a general overview of the steps involved in the building construction process, which can vary depending on the size, complexity, and location of the building project.

The residential building construction process is a systematic task done by skilled persons. Therefore, care should be taken in the building construction process step by step pdf.

Before planning, building construction projects must consider important aspects of house construction steps like the purpose of construction, utility, financial proficiency, the demand for work, etc. 

As the decision of building construction is taken, the planning phase is started. The building construction process from start to finish (pdf) is discussed here in detail. First of all start with some preconstruction steps.

Read More: 17 Tips For How To Reduce Construction Cost

Building Construction Process

The process of building construction involves several stages, from planning and design to the actual construction and completion of a building project. The following is a general outline of the steps involved in building construction:

A. Pre-Construction Steps

  1. To Acquire Land or Plot
  2. To Seek Technical Help
  3. Prepare Estimation and Budgets
  4. Permission from Authorities
  5. Approach a Builder
  6. Superstructure – Column

B. During Building Construction Steps

  1. Site Preparation or Levelling work
  2. Excavation and PPC
  3. Foundation
  4. Plinth Beam or Slab
  5. Superstructure – Column
  6. Brick Masonry Work
  7. The Lintel Over Door Window Gaps
  8. Floor Slab or Roof Structure
  9. Door Window Framing and Fixations
  10. Electrical and Plumbing
  11. Exterior Finishing
  12. Terrace and Roof Finishing
  13. Internal Finishes
  14. Woodwork and Fixture Fittings
  15. Waterproofing
  16. Painting Work

Let’s discuss the building construction process in detail

A. Pre-Construction Steps (Phase – I)

1. To Acquire Land or Plot

It is the most important step in building construction. Search for the location of the building which is best suited for building construction purposes.

Be careful while selecting land that has all the desired facilities available nearby and should be free from all land-related issues.

It is suggested that prior data collection before buying land or a plot either by doing research online or seeking help from real estate agents or concerned persons regarding the effective cost of the same.

2. To Seek Technical Help

After selecting the proper land for the building, take the help of a professional architect to create building designs and take his/her advice.

An architect prepares a plan as per building requirements, number of flats, and shops based on your requirements and budget.

Then the architect consults with a structural engineer for details of the reinforcements to be used, how deep your foundation will be, the size of gravel to be used, pillar width, etc.

3. Preparing Estimate and Budget

Building construction involves a huge amount of material and budget. After, planning and structural detailing have been completed these details are transferred to the building estimator.

The building estimator will estimate the material quantity, and quantity of different items of work, and prepare an abstract sheet that shows the cost of building construction.

If financial resources are limited, we need to seek pre-approval for loans in advance, or else you may end up in a cash crunch situation.

4. Permission from Authorities

This is important work to do after the project is ready to be executed. For that, we have to take permission from the local municipal body before you could go for the construction.

Following are the list of document project required before applying for permission. This document may differ from state to state, but some are essential for every building construction work.

a) Land survey: A survey of the land has to be carried out with the help of an authorized land surveyor

b) Soil test report of the land.

c) Land documents.

d) Architecture/ elevation/ sectional drawings.

e) Structural report.

f)  Architect Certificate of undertaking on Record and Certificate of the undertaking of Civil Engineer on Record

Read More: Building Materials List | Building Construction Materials List

5. Approach a Builder

A builder or contractor for construction must be chosen carefully because it is a major factor in securing building construction quality and timely construction of work.

Pre-investigation must be done about the builder before handing in work. In the contract document, all the work-related details must be clearly stated.

The contract document should cover layout and work details along with the payment methods, time scales, and costs. The condition of the contract should be thoroughly checked before signing a final deal.

Building Construction Step (Phase – II)

The following are the building construction steps involved in any type of construction.

1. Site Preparation or Leveling

The construction site must be cleaned before the work is executed. This work involves the removal of roots of trees, and debris, and leveling the ground area.

2. Excavation and PCC

The foundation of the building ground is excavated with the help of excavating machines as per the building dimension specified in the drawings.

In this foundation trench, a layer of PCC (Plain cement concrete) is laid in the dug portion before placing the reinforcements for the foundation.

3. Foundation

Building Foundation Construction

The building is supported on the foundation is the lowermost part of the building that is in contact with the soil.

A building is a load transferred from the superstructure to the soil and needs to be extremely strong to handle the load.

After the PCC work foundation reinforcement work is started. The foundation’s bottom level must check before concreting it. The remaining space between the foundation is filled with earth.

4. Plinth Beam and Slab

Plinth Beam

After the foundation work is done ground beam formwork preparation is started and poured with concrete. Over the plinth beam, masonry work is started. And space between the foundation and the plinth beam is filled with soil.

Read More: Standard Ceiling Height | Ceiling Height | Average Ceiling Height 

5. Superstructure – Column

The superstructure is the portion above the plinth level of the building. The main component of the superstructure is a column and a beam. 

The columns are built up to slab level and the frame for further construction is prepared.

RCC Frame Structure

6. Brick Masonry Work

As the column and beam framework is completed masonry work is started with different materials such as bricks, concrete blocks, fly ash bricks, etc. according to the building drawing.

Masonry work is done using a cement mortar mix. It is a mixture of cement & sand. During this carefully and as per drawing gaps are laid for doors and windows during the masonry work.

7. The Lintel Over Door Window Gaps

The lintel is constructed on the door and window to support the masonry work over it. After this further masonry work is done.

8. Floor Slab or Roof Structure

Then the formwork is started to construct the slab resting on the column and beam. Over slab formwork, slab reinforcement is placed as per the slab detailed drawing.

9. Door Window Framing and Fixations

After that door window frames are fixed at their specified position given in the drawing.

10. Electrical and Plumbing

As we know buildings are constructed with a clean finish in which electrical and plumbing work is not visible.

They are installed in the walls and slabs such that they are concealed and not visible after the finishing work is done.

The point and pipe ends are left out such that later they can be finished with the electric fitting and plumbing fixtures.

Read More: 25 + Types Of Doors For Your Perfect House

11. Exterior Finishing

Once this work is completed, external plastering and finishing work is started. Waterproofing is also done to prevent rising dampness in the wall. External cladding can also be done to enhance the elevation of the house.

12. Terrace and Roof Finishing

On top of the slab, waterproofing is done to prevent any leakage in the slab. Generally, terrazzo tiling is done to prevent the slab from a weathering effect.

13. Internal Finishing

Internal walls are plaster with a smooth finish and flooring is done with tiles. Later on, the walls are painted or textured.

14. Woodwork and Fixture Fittings

By following the above step, almost all construction work is completed, and then furniture work is started. Side by side, electrical fitting, switchboard, and plumbing fittings are complete in the bathrooms and kitchen areas too.

15. Waterproofing

Waterproofing is a method that prevents water from penetrating your house. Waterproofing is very important as it helps keep your house dry.

It helps reduce humidity inside the house and thereby protects things inside your house from damage caused due to humidity or water exposure

16. Painting Work

The most important purpose of house painting is to give our house a long life and adding colors to it is to give our house a beautiful makeover. 

The painting work not only adds colors to house walls but protects their house from all stains and dirt and gives their house a long life, however, walls have a way of finding some stains.

There are various paint qualities that can be used to protect our house for a long time from stains, mud, sunlight, rain, dirt, etc.

from basic paint to high-quality paint which can give our house 5 to 10 years of extra life and an amazing look for the exterior and interior as well.

The last step of building construction is interior decoration work completing the building construction with proper furnishing and fabric used.

Building Construction Process Step by Step pdf

The process of building construction involves different stages of work that are executed by engineers and supervisors.

The major pre-construction work is done by the architect, structural designer, and management team.

Free download Construction Stages of Building a House pdf,

Conclusion

In conclusion, the process of building construction is a complex and multi-step process that involves various stages from planning and design to the actual construction and completion of a building project.

Effective planning, design, and coordination among all stakeholders, including architects, engineers, contractors, and local authorities, are crucial to the success of a building construction project.

The process requires careful attention to detail, including the selection of materials, the use of proper techniques and tools, and the adherence to building codes and safety regulations.

The end result of a well-executed building construction project is a safe, functional, and aesthetically pleasing building that serves the intended purpose and provides a comfortable and secure environment for its occupants.

You May Also Like

Share This Post

13 thoughts on “Building Construction Process Step by Step”

  1. Hi Dear,
    1st of all, i would like to say thank you for you great work and your effort as you put in a website to provide such information to engineers and those intrested in constractions field.
    I get your reference from website when i was searching google for my floor plan. I am not a engineer.
    but i like the way you presenting/ providing the informations to new joiners.
    Thanks again, and in advance if you can help me in making floor plan in below details.

    Total area: 20*50= 1000 Sq ft.
    Bed Room= 3
    Kitchen=1
    Bath Room=1 full
    Guest Room cum Hall with attached half bath room
    Varanda=

  2. Abdullah Faiz

    Dear Team, Thank you so much for sharing the useful information for the people like me who are not engineer at all, but can get a good idea of the construction processes. Best regards. Abdullah Faiz

  3. Gbenga Dosumu

    Thank you Engr Bhushan Mahajan for this great work. It is the best I have read . Easily readable and understandable especially for real estate enthusiasts.. I will like to read your work in area of simple functional and affordable precast construction.

  4. Pingback: Building Construction Process from Start to Finish – INTERESTING ENGINEERING

  5. Launch Construction

    Nice Blog. Very Useful Information. Thanks for sharing. We also provide the home building services.

  6. Thanks for share

    If you have questions about metal stud framing or light gauge metal, reach The Steel Network. Their experienced team is ready to clear all your concerns.

  7. It’s interesting when you said that the proper equipment for a great outcome of the service. One of my parent’s friends is hoping to find a site preparation service as he is planning to build a commercial property and asked if I have any idea what is the best option to do. Thanks to this informative article and I’ll be sure to tell him that he can consult a well-known construction firm as they can answer all his inquiries.

Leave a Reply

Scroll to Top
DMCA.com Protection Status